VIKAS CONSTRUCTION CO.
Palghar, Thane, Mumbai & Navi Mumbai
Vikas Construction Logo
HOME ABOUT US SERVICES PROJECTS GALLERY CONTACT US

Turnkey Structural & Construction Services

From pre-engineered steel buildings to bespoke luxury residences, we bring structural precision and quality materials to every build.

Industrial Factory Construction & PEB

We engineer heavy-duty factory manufacturing plants using Pre-Engineered Steel Frames (PEB). Designed for heavy crane loads, thermal insulation, and long-span durability.

  • Heavy Structural Steel Fabrication
  • Overhead Crane Gantry Integration
  • Insulated Roofing & Ventilation Systems

Logistics Parks & Heavy Warehousing

High-cube industrial warehouses designed for high-density storage and rapid logistics turnaround across Maharashtra.

  • Laser-Screed Super Flat FM2 Concrete Flooring
  • Automated Loading Dock Systems
  • Heavy Transport Apron & Circulation Roads

Luxury Residential Estates & Villas

Custom luxury home construction combining modern architectural minimalism with robust reinforced concrete structure.

  • Bespoke Architectural Engineering
  • High-End Stone & Italian Marble Finishes
  • Smart Home & Landscaping Integration

Our 5-Stage Engineering Methodology

A disciplined construction workflow that guarantees quality, safety, and strict schedule adherence.

STAGE 01

BIM & Blueprint Design

Soil testing, architectural layout, structural steel analysis, and municipal approval filings.

STAGE 02

PEB Steel Fabrication

Precision cutting, shot-blasting, and anti-corrosion coating of steel girders offsite.

STAGE 03

Foundation & RCC Civil

Deep pile/raft foundations, RCC column casting, and ground slab concrete pouring.

STAGE 04

Erection & Cladding

Onsite crane erection of PEB framework, wall cladding, and roof sheeting installation.

STAGE 05

Quality Testing & Handover

Final non-destructive testing, MEP commissioning, and turnkey handover to client.

Estimate Project Budget

Adjust parameters below to get instant approximate estimates for cost, timeline, and structural steel requirement.

ESTIMATED BUDGET RANGE
₹4.12 Cr*
5 Months
Timeline
~130 Metric Tons
Steel Needed

Client Inquiries & Answers

What are the main advantages of Pre-Engineered Steel Buildings (PEB)? +

PEB structures reduce construction time by 40-50% compared to traditional RCC, offer large clear spans without interior columns, and provide superior thermal insulation and seismic resistance.

How long does it take to construct a 50,000 sq. ft. industrial warehouse? +

A typical 50,000 sq. ft. warehouse project in Palghar takes approximately 4 to 6 months from foundation pouring to handover, depending on soil conditions and steel fabrication schedules.

Do you assist with municipal sanctioning and approvals in Maharashtra? +

Yes. As part of our turnkey civil contracting services, we prepare architectural blueprints and assist clients with local municipal permissions, MIDC approvals, and fire safety NOCs.